Sakai North Route Pipeline of Osaka Gas
Civil EngineeringKinkiEnergy Facilities1996~2000
Owner | Osaka Gas Co., Ltd. |
---|---|
Location | Suminoeku, Osaka |
Completion | November, 1997 |
Work Summary | Launching Shaft(Press-In Open Caisson Method) ・Inner Diameter:8,500mm ・Length:42.3m Arrival Shaft(Steel Underground Continuous Wall Construction Method) ・Inner Diameter:6,500mm ・Length:42.5m Mud Pressure Balanced Shield Method RC Segment ・Outer Diameter:2,800mm ・Inner Diameter:2,400mm ・Legth:1,063m |