Consturuction of Sewerage Line at Kannon 2-1
Civil EngineeringChugokuWater and Sewage Facilities2021~2024
![Consturuction of Sewerage Line at Kannon 2-1](/works/images/21-18_img01.jpg)
![Consturuction of Sewerage Line at Kannon 2-1](/works/images/21-18_img02.jpg)
![Consturuction of Sewerage Line at Kannon 2-1](/works/images/21-18_img03.jpg)
![Consturuction of Sewerage Line at Kannon 2-1](/works/images/21-18_img04.jpg)
Owner | Hiroshima City |
---|---|
Location | Nishi-ku, Hiroshima City |
Completion | July, 2023 |
Work Summary | Launching Shaft (Press-In Open Caisson Method) ・Inner Diameter:13.0m ・Outer Diameter:16.0m ・Length:44.0m Pre-boring Method ・Diameter:2.0m ・Length:45.0m ・Number of piles:40 |