Recovery of coast, Ryoishi port
Civil EngineeringTohokuDam/Regulating Reservoir2016~2020
Owner | Iwate prefecture |
---|---|
Location | Kamaishi city, Iwate |
Completion | July, 2018 |
Work Summary | 186 Steel Pipe Piles: φ1,500 t=15~25mm L=22.5~26.5m Precast Coating: 3,134m2 Packed Concrete Coating: 1,173m3 Removal of Exisiting Seawalls: 486m3 |