Zenitaka Major Works
Shizuoka Stadium ECOPA
Building ConstructionChubuSport/Leisure Facilities2001~2005
Owner | Shizuoka Prefecture |
---|---|
Location | Fukuroi City, Shizuoka Prefecture |
Completion | March, 2001 |
Work Summary | RC/SRC/PC/S Building Area 30,874㎡ Floor Area 81,200㎡ Of the above area, the area executed by our company (No. 4 construction section) is as follow. Building Area 5,360㎡ Floor Area 11,630㎡ An Award of the 44th (2003) BCS Prize |
Awards | BCS Prize |