Keihan Nakanoshima Line Second Construction Zone

Civil EngineeringKinkiRailway Facilities2006~2010
Keihan Nakanoshima Line  Second Construction Zone
Keihan Nakanoshima Line  Second Construction Zone
Keihan Nakanoshima Line  Second Construction Zone
Owner Nakanoshima Rapid Railway Co., Ltd.
Location Kitaku Nakanoshima,Osaka
Completion August, 2009
Work Summary ・Total Length 536m
・Open Cut Method
 Total Length 245m
 Excavation 58,036m3
 Framework Concrete 16,329m3
・Mud Pressure Balanced Shiled Method
 Outer Diameter 6,950mm
 Total Driving Length 581.5m
  -Single Shield Machine was turned back from end point
・Ground Improvement(High Pressure Injection Stirrer, Chemical Injection)